Beige Limestone Bathtub
Hand-Carved Freestanding Natural Stone Bath
A beige limestone freestanding bathtub concept for made-to-order bathroom projects. The supplied set pairs an architectural design visualization with factory-yard views of the oval bath form, so buyers can discuss stone selection, finish, drainage and dimensions with the project team before fabrication.
Technical Specifications
- Product Form
- Freestanding oval bathtub
- Material
- Beige limestone — selected block to be confirmed
- Surface Finish
- Honed sample basis — confirm before fabrication
- Overall Dimensions
- Reference 1650–1800 L × 800–1000 W × 550–650 H mm — confirm before fabrication
- Wall Thickness
- Confirm from approved shop drawing
- Drainage
- Drain position and fittings to approved drawing
- Sealing
- Sealer system to selected limestone and maintenance plan
- Support & Installation
- Structural support and lifting plan by project team
Frequently Asked Questions
Is the hero image a completed bathroom project?
No. The hero image is clearly presented as an Architectural Design Visualization. It is a concept reference and does not represent a named completed project or installation.
Which supplied images show the physical bathtub?
The two factory-yard images show the supplied beige limestone oval bathtub form before dispatch. They are workshop references rather than named project photography.
What dimensions are available for this limestone bathtub?
The page shows a reference range of 1650–1800 mm long, 800–1000 mm wide and 550–650 mm high. Final dimensions must be confirmed from the approved project drawing before fabrication.
Can the bathtub be made to a custom size?
Custom project sizing can be discussed after the buyer provides the required layout, dimensions, drain position and installation constraints.
Is the finish fixed to honed?
Honed is the reference finish for this supplied product set. The final finish should be confirmed against an approved stone sample before fabrication.
How are drainage details handled?
Drain position, fittings and connection details are coordinated from the approved shop drawing and the project plumbing requirements.
What should be reviewed before installation?
The project team should review floor loading, lifting access, waterproofing, drainage, sealing and the final approved dimensions before installation.
What information is needed for an inquiry?
Please share the required dimensions, drawing or layout, destination, preferred finish, drain requirement and expected order timing for a project-specific review.